- Joined
- Apr 18, 2002
- Messages
- 8,069
- Reaction score
- 25
At this point, we have to install some clips on the electric meter, hang two shutters, align one bi-fold door, and fix the shed doors. Other than waiting for the plummers to do their thing, that is all we have left. We are supposed to be going to final inspection between March 15-17. Then we start moving provided everything goes off without a hitch.